On 23.12.24-1.1.25 we are closed for holidays. Eshop remains open, we will process orders on 2.1.2025. Thank you for your understanding..

Long Lead EDC

Code: 01SC080
Not rated
€37,62
On order, usually 20 days

Detailed information

Product detailed description

The Magnum Long Lead EDC is a classic men's and gourmet pocket knife for everyday use that immediately impresses with its simple, slightly curved design. The no-cost design is matched by the technical construction as a slip joint knife, which has proven itself a million times over thanks to its simple operation and fewer parts. The satin-finished 8Cr13MoV stainless steel blade is ground flat and is opened manually with the nail. The slightly contoured handle made of textured G10 material feels comfortable in the hand.

Overall length: 18.4 cm
Blade length: 8 cm
Blade thickness: 2.7 mm
Weight: 78 g
Blade material: 8Cr13MoV
Handle material: G10

Additional parameters

Category: Classic folding knives
Blade material: stainless PLUS
Blade length: 8 to 10cm
Handle material: G-10
Aktualizace: BOKER24

Be the first who will post an article to this item!

Do not fill out this field:

bokermag

Böker - the history of the factory dates back to the 17th century, the original forge was then located in Remscheid. In 1829-30, production was extended to sabres and swords. At that time, the factory employed over 100 blacksmiths and sharpeners. In the second half of the 19th century, part of the family moved to the USA and Canada, where they established further production facilities. The last of the Bocker siblings, Heinrich, moved to Solingen where most of today's production comes from. Boker manufactures knives according to its own designs and those of well-known knifemakers.
The company now manufactures its products in Germany, the USA and Argentina and uses the marketing brand MAGNUM. Böker develops new types and designs itself and employs several designers. The knives are manufactured on CNC (computer controlled machine tools) with the highest quality.


Vytvořil Shoptet | Design Shoptetak.cz.